Engine is ready for assembly, off to get the crank balanced tomorrow I can rebuild the bottom-end tomorrow night. Just waiting for 8 new lifters for the head, head is ready for assembly.
Got some proper sealant for the gasketless joints, there are no gaskets on the engine bar the head gasket. Only had a 10ml bottle though so have to find some more tomorrow.
Just need the water tube welding to the block, but that can be done anytime, make a water rial for the other side, wasn't happy with my previous design. Bulkhead can be painted once it welded...Couple of small tasks on it first...Need to source some odd bolts for this and that...
Majority of fabricating and mods are done. Everything is clean and once the bulkhead and engine are built progress will be very rapid I think. Lots of small parts needed sourcing which has kept me busy.
No comments:
Post a Comment