Friday, November 02, 2007

Always double check.

Well, the reason my K series engine had a manky cam lobe may have surfaced during a pre-assembly dummy run of the cam carrier.

Now...the head has the cams sandwiched between the head and cam carrier...I stuck the cam carrier on and just nipped the bolts up and the inlet cam is fine. However the exhaust cam had some excess play, up and down, worse at the back...So the carrier was not fully home for some reason.

I noticed when I pulled it apart that there was a small bit of pick-up marking on the rear journal housing. Nothing to worry about its a small mark. However on very close inspection some of this material that had picked up had made it into the face area on the carrier...Now if it was put together right, torqued down how can this material form a tiny burr on a matting face that is bolted down flat onto another piece of alloy that is also flat? Thats not possible for it form a burr there as it would need to lift the carrier up and move material to the right into a space that doesn't exist...There was no dimple in the head under it so it cannot have moved there. Bit odd.
I removed the burr and its perfect. I also noticed another small piece of machining debris that had ended up crushed somewhere else into the carrier, removed that too. However that was not the source of the loose exhaust cam.

From my assessment of the engine it may have had the head removed for a gasket job in the past. Being as it had only been 30K miles and had a manky crap factory gasket and plastic head dowels I thought it was unlikely, but it was an older 99 engine before some updates to the gasket...I did notice the head looked like it had been sanded on a special machine (factory reface to save skim) I found this out after I stripped it... It now looks like some slaparsed Rover engineer may have stripped the head and stuck it back together long time ago with this piece of debris I mentioned between the head and carrier, causing the exhaust to be very slightly loose, the gloop used would taken up the gap and sealed ok....the inlet cams would not be effected by being loose as they are centralised by the VVC system at either end, so they were ok. I assume its been run for a while with a loose exhaust cam, thats caused some odd harmonic and destroyed the lobes....Also this all adds up as the rear two lobes were not good on the cam and all the followers were not what I'd have expected from a low mileage engine and all the exhausts needed replacing. These K cams are very high quality.

So my diagnosis is that you should NEVER trust a dealer, or main dealer mechanic to do anything bar wreck your car.

Lucky the carrier and head journals have survived and the engine should now by quieter and not self destruct...Had I not done the usual and trial fitted everything and checked everything it would probably eat cams in no time and be noisey and horrible.

Cannot see it left the factory like that, someone else has been involved, warrent job (hohoho). Also its got a mark inside the carrier, someone has added, some numbers, maybe this would tell me the whole story if I knew what it meant.

Thursday, November 01, 2007

Bare Necessities

One altered fuel tank.


Totally bare tub.
Few bits to do still. Have to get in there and key the whole floor pan and bulkhead, snore...

I can paint the vertical section of the bulkhead inside and the outside , hopefully this weekend. Few holes to plug up and drill but the majority is done. I'll blast a bit of stonechip over a few bits first. I can paint everything bar the actual floorpans and brush them with 2pack when I have finished arsing about.
Boots ready for a lick too. Made a few enquiries about the gearbox tunnel, in hand.

Tuesday, October 30, 2007

Mildy annoying

The place I get my paint from has phased out 2pack.

All they had is some water based crap that you need to spray an epoxy lacquer over. Sounds like bureaucratic nonsense to me...Paint is good for the environment but the lacquer just as bad.

Hopefully have some full strength Triumph White No19 on Thursday from my local paint shop.

Got the fuel tank modified to take JIC connections, made up a nice aerospace line from the tank to the pump. Just need a 1/8th NPT to JIC 6 adaptor for the facet pump now.

Finished off my bonnet wiring, just need to lift it on and cut the wires down and solder on a connector block.

Saw the bloke who painted my car today, he has blood cancer, which is a bit of shame, but he is responding well to treatment..Discovered by accident when his back gave out and he went to the quack for some pain killers, a bit of bunged up bowels for a week, lost some weight...It leeches all the calcium from your bones and weakens them, the calcium then kills your kidneys...Another 48hrs he'd have been dead from Kidney failure! They flushed him out and he's been on Kemo for while...I was already aware your life is hanging on a thread, but its times like that its really driven home...Don't take nowt for granted! Every day above ground is a good day! Even if your life is shit, its better than being dead!

I guess the blog fans are expecting some major progress soon, it will happen :) Its like a set of scales atm, tipping this and that way...Bit more on the one side it'll all fall into place :)

Oh and no sign of my Airmail packets...Each day I pine like a dog waiting for the postman...

RM say "we are processing mail in the order it arrived" like you are, cause my packets arrived in the UK days before the strike...lazy bastards, get those striking prats on unpaid overtime to clear the mess! Don't know their arse from their elbow. Its been two weeks, how long can it take to clear a few days mail...They will probably just incinerate it all when these lazy tosspots don't get anything done and piss off home when they want, enjoying Spanish practices. Replace them all with Polish!

Sunday, October 28, 2007

Mumbling part 2

Too many ideas for a gearbox tunnel...

Noticed there is a company a few miles away who can vacuum form ABS plastic.

Have to give them a bell.

I could then knock up a mould/shaped object from various materials and get them to vac form some 3mm? ABS over it. Not much to consider and a neat way of getting a 1 piece tunnel thats got a bit of flex and some sound deadening and heat resistance properties, also can be made in virtually any colour. Its really the only job left. Kind of intended to make some alloy thing, but I like the idea of ABS plastic.

I could knock up a stiff mould using bits of wood like a skeleton structure with some thin alloy sheet stretch over and bonded on.

Atleast this way I can knock up a mould pretty quickly not having to be concerned with asthetics and not have to get any specialist welding done or incur any great material costs...probably only £10 for a massive sheet of 1mm alloy.

Could also get a couple of tunnels made at once.

It may not possible, but I see they form dashboards and all manner of stuff.

Being as its on show and not covered by carpet etc I cant bare looking at anything substandard everytime I get in.

Cheers to Viking Longship for suggesting that I turn on Word Verfication to stop the ever increasing amount of spam comments this blog is attracting!

Mumblings

Been a bit busy on other things the last week.

Have a quiet week coming up.

Just at the point of stripping out the cockpit and painting it, also bulkhead.

Been waiting for parts for my fuel system and other things that were delayed in the postal strike. Some arrived, some not, I have some stuff thats meant to be coming airmail, no sign of that, its been 3weeks, I am pissed off.

Useless service. Sooner the Royalmail go down the pan the better! Holding the country to ransome is out of order, its effected business for everyone. I rarely use the RM for packages anyway and I will never give them my money again for any items over 2kilos.

This is where they make their money, they make nothing on first class mail, so its where to kick them hardest. I mean you can book a courier to come collect for £6.50 up to 25kilos, send that RM its like £20-30, this farce must end! Internal packages in Germany can be send up to 10kilos for about £4. Its taking the piss, rip off the Brits eh!

Anyway enough of that!

Hopefully get the front of the cockpit and boot painted this week and start fitting it out.

I decided to just convert the tank to pump piping to JIC connections as I can reuse the fittings and hose when I fuel inject the car. I'll leave the rest of the system as it was, just using a normal brass line on the chassis.

Bonnet is about done.

I have an Innovate Motorsports LC-1 with DB Gauge Wideband meter on the way also. That can be attached to a laptop for logging fuel ratios and also it can replicate the narrowband sensor for fuel injection ECU giving better results. So its good for the future. If I fuel inject I'll be using megasquirt as the wiring and systems already on the car can be slightly adjusted and work with it. I'll probably just "slap on" a set of Jenvey throttle bodies on my existing manifold. Its ported for 45mm bodies, the air filter system and trumpets will all bolt straight on, as Jenvey DCOE/DHLA flange pattern bodies are an exact replica of the carb's flange and mounting holes. So that really should only be a day job.

Hopefully some good progress this week!

Oh and btw, spammers, its a waste of time spamming this blog, I will not publish your penis enlargement messages, so don't waste your time!