Sometime ago I had to mount the alternator the other way up as the caterham exhaust manifold left the wires dangerously close to the primary pipe on No1. This meant I had to adjust the engine mount. As seen below, no room for a bolt head with a washer and split washer below the head. Best solution was just to bore a recess hole into the tube and then fit a socket screw with an allen head rather than chop down the mount and weld it up again. This way it'll sit flush...Have to source a 1/2" UNF allen bolt 3" long... Apex Fasteners are useful for odd stuff.
Pretty damn pleased with engine mounts...I spent a while considering them. The E-Type mounts make it virtually hard mounted, the only thing they allow is damping of vibration, there will be no vertical, or sideways rotation or movement on the engine. The raked angle means the engine cannot move side to side as it would need to tear the mounts, and the stiff mounts mean it can't flex on the mounts up or down..Have to get on with that Strut brace sometime, no priority on that, probably make it from alloy tube...After all its a 1/3rd the weight of steel!
Similar clearance issue on the starter motor, all caterhams have the block shaved, as done already, but again no room for bolt so socket screw again.
Having an evening off the paint while it slowly bakes. I'll add a bit more paint on a few areas later then get it topcoated later this week.
Engine mounts and few final brackets can go for powdercoating now...Just need to baffle the sump next and fit that and the engine can go back in, need to source some more funny sealer first.
Oh and those throttle bodies will fit, 270mm flange to trumpet, so should be able to fit them straight on using the standard ITG powerful foam filter. Probably buy them, as the carbs on the car are worth alot and the manifold, trumpets, regulator, fuel pump. Infact I can sell all that buy those throttle bodies and Megasquirt box, injection filter, pump, lines and come out with a profit or atleast break even...So, I could probably even sell the throttle bodies on for a profit...So why not. It will stay on carbs for the time being as its easier for me to handle the tuning and whatever and I need a bit of time to get the whole car in touch...Call that a sideline project for next winter. I want to leave some stuff to do!
Monday, November 05, 2007
Bit of fettling
Posted by
David Powell
at
7:24 PM
0
comments
Shiney Shiney
Progressing nicely.
Had a couple of small areas of reaction...sorted those out.
Been using an airmask, better than doing it outside, its been too damp and cold.
Bulkhead is just waiting for the paint to go bonehard now and I'll top coat once I've knocked it back and roughed it up again. Actually getting a really slick finish with a brush after alot of messing about with techniques...So I will just brush the bulkhead the paint is as shiney as from the gun and no real brush marks at all. Also the spraygun I have used it not that good for 2K, I hate painting so won't buying any kit to do any.
I found the best method is to mix the 2K paint 2:1 with activator, leave it in a plastic cup for about 1hr or just over, occasionally mixing it again till it goes like syrup, or a bit runnier....Then slap it on with a nice quality soft brush, it self levels and goes pretty hard quick as thats a big dose of activator. My reaction was due to the fact I slapped some on too easy before the activator had mostly evaporated and started to thicken the paint...
I do not profess to have any interest in painting or related stuff, I hate it. I prefer spanners and engineering! The top sections and side sections of the bulkhead are done on both sides, nice finish, actually no runs, any visable runs were there from whoever did it before. After leaving the paint to thicken up it just stays where its put on verticals. Come together nicely.
I'll leave the floorpans for a while and will probably spray them? Mainly due to the fact it does take some time for painted on paint to deep harden and it'll be the last job on the floorpans and it'll hold me up if they take a while to harden fully...which is no problem on any other area...the only bolted down parts, pedal box, heater will not be going on for atleast a month.
Be glad to get this done.
Posted by
David Powell
at
1:36 AM
0
comments
Sunday, November 04, 2007
Conversely
I know the ratios are gonna annoy me and it'll be near its limit of durability now and certainly in the future.
I think I'll see what I can source in the way of a close-ratio box before I fit the engine, as fingers crossed it won't be coming out again for a while. Tran-X and Quaife. Either a whole box or a clubman ratio set. Something with silly 1st and 2nd gear lengths. I can add my shortened rear extension and gear lever rod to it.
Stock ratios are 1st: 3.65, 2nd 1:98, 3rd 1.37, 4th 1:1, 5th 0.89 or something...
Basically first gear will be useless, 2nd gear will be useless...I know at the Ring and Combe there was nowhere I could use 2nd without being at near on 8000rpm.
Quaife Clubman semi straight cut synchro kits come in the following ratios.
1st - 2.040, 2.200, 2.390, 2.745
2nd - 1.540, 1.690 (so should do 70mph in 2nd at 7000 or so)
3rd - 1.210
4th - 1:1
5th - 0.870, 0.930
I just know it'll be a total nightmare on the normal ratios....Could use a 2.8i box but thats not ideal either...Obviously the perfect solution is the Caterham 6 speed, but unless one falls from the sky into the garage that ain't happening!
Probably be quite painful on the ears with a straight cut box, best design in some large areas for sound deadening on my gearbox tunnel...Also with the carbs right on the bulkhead it'll be a bit brash inside :)
Got a few things kicking around from the old setup and wot not that I can sell to cover the cost.

Conversely to some peoples opinions there are people who enjoy the preperation and engineering side of projects as much as driving them!
Anyways, once this painting is done, its gonna be the part enjoy, the slide downhill to the finish-line!
Posted by
David Powell
at
3:36 PM
0
comments
Saturday, November 03, 2007
Progressing
Boot done. Have to wait a bit for it to fully cure, as it was brushed on, saves tonnes of dust and hassle, it'll be fine in a week or so. Used some fast activator. Once it mostly cured i'll stick a fan heater on low setting under it for a few hours. Brushing is good for getting a thick coat in the tricky areas. Bulkhead is mostly done. Again sealed the wounds with grey topcoat, where cutting and such like has eaten through the layers of primer, stonechip, and top coats from previous jobs... let it cure and then stonechipped the majority of it, saves prepping up and gives an even finish.
Once the stone chip went off I have given the tricky areas a coat of grey topcoat, brushed again, hard to get a decent coat on the tricky bits with a gun. I'll need to leave the stonechip a week or so to go off fully in areas where its layered on, probably heat the bulkhead for a half day with fan heater on low. You can't rush the stonechip or paint curing as it'll blister or develop bubble marks, has to cure at a slow speed, so its actually good its quite cool atm. Very prone to reaction if you rush the curing, I pray for no reaction when top-coating...Without stripping the whole bulkhead to baremetal and etching it, then stonechipping it, you just have to be patient.
I'll go over the grey areas with some white topcoat, tomorrow maybe when I have finished some other bits by the battery box. Wait for a week and lightly sand off the surface of the entire bulkhead and give it a sprayed topcoat. Never was happy with the paint thickness on the tricky areas anyway.
Same deal on the inside.
I forgot i'll need to weld in some more raduis arm mounts to the rear floorpans/strengthening for the CV jobbie, so that will keep me busy while the stuff cures.
Only had a tiny reaction on a couple of areas so far, so, so far so good.
Posted by
David Powell
at
10:51 PM